fbpx

Road construction season will start this spring. These works will undoubtedly cause some temporary inconveniences. We urge all pedestrians, cyclists and motorists to take care when around or near a construction site. Work scheduled for 2022 can be summarized as follows:

 

Rehabilitation Work

Work consisting of inserting a liner inside the existing sanitary sewer will be carried out on the following streets or parts thereof:

  • Beaconsfield Boulevard, from 575 to 587 Beaconsfield Blvd.
  • Midland, from 110 Midland to Maplebrook
  • Lakeview, from 101 Lakeview to Church
  • Maplebrook, from 555 Maplebrook to Lakeview
  • Brentwood, from 118 Brentwood to Chester
  • Madsen, from 95 Madsen to 519 Church
  • St-Lawrence, from 483 St-Lawrence to Fieldfare
  • Madsen, from 95 to 109 Madsen
  • Madsen, from 109 to 113 Madsen
  • Basswood, from 116 Basswood to Fieldfare
  • Fairlawn, from 105 to 109 Fairlawn
  • Fairlawn, from 71 to 87 Fairlawn
  • Prairie Drive, from 25 to 26 Prairie Drive
  • Jasper, from 125 to 129 Jasper
  • Margaret-Ann, from 25 Margaret-Ann to Beaconsfield Blvd.
  • Kirkwood, from 3 to 15 Kirkwood
  • Fairlawn, from 129 Fairlawn to Willowbrook
  • Fairlawn, from 53 to 71 Fairlawn
  • Glendale, from 35 Glendale to Claude
  • Sweetbriar, from 50 Sweetbriar to Claude
  • Kenwood, from 78 Kenwood to 86 Kenwood
  • Jasper, from 88 to 104 Jasper
  • Jasper, from117 to 125 Jasper
  • Prairie Drive, from 5 Prairie Drive to St-Charles Blvd.
  • Charleswood, at the intersection of Charleswood & Sweetbriar
  • At the intersection of Charleswood & Watford
  • Kirkwood, from 57 Lakeshore to the intersection Kirkwood & Lakeshore
  • Kirkwood, from 86 to 96 Kirkwood
  • Hansen, from 41 Hansen to Claude
  • Hansen, from 21 to 41 Hansen
  • Hansen, from 15 to 21 Hansen
  • Hansen, from 9 to 15 Hansen
  • Harwood Gate, from 113 to 119 Harwood Gate

 

Refurbishment of flat stone banks on St-Charles Blvd. under Highway 20

 

New sidewalks:

  • Biscayne
  • Allancroft, from Sherbrooke to Wood Cr.

 

Inspection and cleaning of the sanitary network:

  • Beacon Hill sector
  • Willowbrook
  • Claude, from Beaconsfield Blvd. to Briarwood
  • Beaconsfield, from Jasper to East Gables
  • Lakeshore, from Old Church to St-Charles
  • St-Charles Blvd., from Lakeshore to Beaconsfield Blvd.
  • Beaconsfield Ct

 

Street repaving

An additional coat of asphalt will be laid on top of the existing pavement on the following streets:

  • Wakefield
  • Manresa
  • Amherst
  • Rutland, from Amherst to Sutton
  • Elm, from Fairway to Shannon Pk.
  • Leeds
  • Rosedale, from Leeds to Windermere
  • Sherbrooke, from Robin to Hollis
  • Elizabeth, from Coronet to Henry-Jarry
  • Montrose, from Northcliff to Kirkland
  • Glengarry, from Arlington to Westcroft
  • Westcroft, Glengarry to Royal
  • Fleet, from Royal to Glengarry

 

Click here to view the map (PDF). Work will begin mid-May.