-
Page sections
Drop-off site and special pickup
Public Works drop-off site The City provides residents with a special waste drop-off site, at the back of the Public Works building. Use is limited to residents, who must present proof of residency (driver’s licence or municipal tax bill). Up to fi......
-
Page sections
Branches
Every year there are two branch collection periods, one in the spring and another in autumn. The period for spring pick-up starts in April until mid-June. The pick-up in autumn starts in September until the end of October. Branch collection There......
-
Page sections
Renovation
All requests for permits renovations on the Municipalities territory are subject to the Site Planning and Architectural Integration By-law (SPAIP). These requests are analyzed by the Planning Advisory Committee (PAC), whose mandate is to ensure......
-
Page sections
Pool (inground, semi-inground, above-ground)
Delays: March to September: 1 month October to February: 2 weeks Cost: Above ground pool: $ 275 Inground / semi-inground : $ 325 + $ 2,500 deposit Standards to be met: Minimum distance from proper......
-
Page sections
Shed
Delays: Minimum 2 months Cost: $68 $300 for the study of a Site planning and architectural integration program for properties adjacent to Lac St-Louis All requests for permits for new construction, exten......
-
Page sections
Porch
Delays: March to September: 1 month October to February: 2 weeks Project subject to the PAC (Renovation project on the front facade ) Minimum 2 months Projet non subject to the PAC (Renovation projec......
-
Page sections
Extension
Delays : Project subject to the PAC (extension project seem from the street): Minimum 4 months Project not subject to the PAC (extension project not seem from the street) March to September: 1 month Octobre to Febru......
-
Page sections
Detached garage
Delays : March to September: 1 month October to February: 2 weeks Cost: $225 + $2,500 (deposit) Required documents: Site plan prepared by a land surveyor Plans and architectural elevations of detached garage Sta......
-
Page sections
Owning a dog comes with responsibilities
Your dog is certainly an excellent companion but also comes with great responsibilities. Guardians must not only take care of their pets’ daily needs, but also be good neighbours in their community and respect the rights of others. ......
-
Page sections
Organic waste
Schedule New starting in March 2026 As of March 2026, organic waste collection will take place every week, year-round. Organic waste collections days will also change as of March. South sector of Highway 20 : Tuesdays as of 7 a.m......
-
Page sections
Snow removal
The snow from your driveway must be kept on your property and not ploughed onto the street. Dumping or throwing snow on streets, sidewalks, fire hydrants, public places or private property other than your own, is prohibited and subject to a minimum......
-
Page sections
Procedure regarding the reception and examination of complaints
As of May 25, 2019, all municipalities must adopt a policy regarding the reception and examination of complaints filed in connection with the awarding of a contract following a request for public tender or the awarding of a contract by mutual agree......
-
Page sections
Outdoor water conservation
The exterior use of water is permitted as follows: Manual watering of vegetation using a hose fitted with an automatic shut-off device is permitted at all times. The watering of a new lawn, newly planted trees or......
-
Page sections
General Information for Day Camps
Camp Schedule Monday to Friday, from 8:30 a.m. to 4:30 p.m., June 29 to August 14, 2026 (7 weeks, no camp on July 1) Extended Camp Services (offered at all locations) Morning : 7:30 to 8:30 a.m. Afternoon : 4:30 t......
-
Page sections
General Information for Animation in the Park
The Animation in the Park program provides an opportunity for children aged 8 to 12 to enjoy a variety of activities in the park, including sports, games, and crafts in a “kids only” environment. *This program is for children......
-
Page sections
Guidelines
BLOCK PARTY GUIDELINES There are two types of Block Parties: On private property, without encroaching on public domain – this type of party does not require a permit. Extends onto public domain such as......
-
Page sections
Emergency measures and self-sufficiency
Although the City of Beaconsfield has done its best to guarantee the safety and security of its citizens, there is always the possibility that something along the lines of the Ice Storm of 1998 might recur . Under such circumstances the City w......
-
Page sections
Tree policy
It is prohibited to fell any tree located on private property within the territory of the Beaconsfield without having first obtained a permit f......
-
Page sections
Doors
Solid Core vs. Hollow Core Doors Hollow core doors, like the ones used typically for interior doors, are made from a hollow hexagonal core and covered with a decorative wood surface. Solid core doors, made of solid wood or composite material, are b......
-
Page sections
Modifications to existing walls
A much easier and less destructive way to help minimize transmissible noise. Adding Drywall Sheets of drywall can be affixed to the existing wall facing. This method involves removing the base and crown mouldings from the wall before adding the ne......
-
Page sections
New construction
Delays: Minimum 4 months Cost : ($/m 2 of gross floor area) $23.20 /m 2 from 0 to 225 m 2 $ 23.70 /m 2 from 226 to 400 m 2 $ 24.20 /m 2 from 401 to 599 m 2 $ 24.70......
-
Page sections
Pergola
Delays: March to September: 1 month October to February: 2 weeks Coût: $68 Required documents: Copy of a certificate of location with the location of the pergola Construction details o......
-
Page sections
Gazebo
Delays: March to September: 1 month October to February: 2 weeks Cost: $68 Required documents: Copy of a certificate of location with the location of the Gazebo Construction detail......
-
Page sections
Deck
Delays: March to September: 1 month October to February: 2 weeks Cost: $68 Required documents: Copy of a certificate of location with the location of the deck Const......
-
Page sections
Fence
Delays: Minimum 2 months Cost: $68 $300 for the study of a Site planning and architectural integration program for properties adjacent to Lac St-Louis All requests for permits for new construction, exten......