-
Page sections
Electronic products
Electronic products should be thought of as a resource for producing other equipment, rather than as garbage. ICT, information and communications technology equipment, is not picked up in normal garbage collections. Various options make it easy to......
-
Page sections
History of Beaconsfield
Beaurepaire The first concession in Beaconsfield obtained from the Sulpicians was that concession granted to Jean Guenet on May 18th, 1678. It was described as being on Lake St. Louis at Pointe Beaurepaire, bordered on......
-
Page sections
Pesticide contractor registration
An annual registration certificate is required for each contractor who applies pesticides within the territory of the City of Beaconsfield. To obtain this cer......
-
Page sections
Doors
Solid Core vs. Hollow Core Doors Hollow core doors, like the ones used typically for interior doors, are made from a hollow hexagonal core and covered with a decorative wood surface. Solid core doors, made of solid wood or composite material, are b......
-
Page sections
Gas insert
Delays: March to September: 1 month October to February: 2 weeks Cost: Free Required documents: Copy of certificate of location Model of insert Permit......
-
Page sections
FAQ
Why is the centre being renovated if it seems to be well used? While the centre is popular, a survey conducted in 2023 revealed that 70% of respondents felt that the facilities and equipment needed improvements. The centre was originally built in 1......
-
Page sections
Arena renovations
An arena where dreams take shape The project is on track to meet its budget and schedule. The arena should welcome our users again in the summer of 2025. This modernized space will be a place where athletes, young and old, can once again dream! Wo......
-
Page sections
Mayor’s text
Dear citizens, I am pleased to announce that Council has adopted the 2025 budget. We were able to contain the increase in the Beaconsfield portion of the property tax to 2.86%. If we add the waste and water taxes managed by Beaconsfield, the......
-
Page sections
What is the City doing to adapt to climate change?
More than $800,000 invested in ditch rehabilitation to better absorb stormwater Inspections, repairs and modernization of stormwater infrastructure Planting 250 to 300 trees every year on public land ......
-
Page sections
Is this a legal requirement?
The comprehensive review of the regulatory framework is not, in and of itself, a legal requirement. It is an initiative undertaken by the municipality to update its urban planning tools. However, the municipality must comply with&nb......