Permit and request delays

Below is a list of some of the City of Beaconsfield’s most common permits and service requests, along with the typical processing times you can expect for each one. Please note that this table is provided for information purposes only and is not an exhaustive list of all permits and requests available.

Processing times can vary depending on the time of year, the complexity of the file, and the volume of requests received.

For more information on permit types, requirements, and how to apply, please visit our permits page.

Permits and certificates
Type of permit or certificateExpected delay1

For permit issuance 

If project subject to the PAC
March to SeptemberOctober to FebruaryPossibly subject to the PACAlways subject to the PACDelay to be added if subject to the PAC2
Ash tree felling
1 month
2 weeks


Backfill/excavation


Build a pergola gazebo and other garden constructions


Build a shedx
Minimum 2 months
Certificate of occupancy


Commercial renovation


Connection watermain-sewer-aqueduc3x
Minimum 2 months
Culvert installation


Deck


Demolition
xImpossible to determine delay
Detached garage


Door to door distribution


Extensionx
Minimum 2 months
Existing pool upgrade


Fence 




Gazebo


Geothermal well


Heat system installation


Hot tub


Landscaping along the riverbank


New construction
xImpossible to determine delay
Parking space


Pool (inground, semi-inground, above-ground)


Porchx
Minimum 2 months
Renovationx
Minimum 2 months
Resident pool upgrading to standards


Retaining wall




Shed


Tree felling (not ash)


OtherExpected delay
Snow contractors1 week
Landscape contractors
Leaf dumping contractors
Filming operation without location public space
Garage sale




1The delay for issuing the permit begins when all required documents are received and the information needed to issue the permit is complete. 
2The time limits for the PIIA process and for issuing the permit are cumulative. 
3May be issued on an emergency basis if necessary.
Requests
RequestDelays
Accumulation of water in ditch / culvert1 to 3 years
Bad ice condition of an outdoor rink3 days, depending on weather
Bee nest in a public space1 week
Bins not collected24 h to 48 h
Collection of bulky items not completed1 week
Damage in a park / playground4 weeks
Damage in park chalet4 weeks
Damaged bins7 to 10 days
Dead animal on public roadN/A
Defective lighting in a park3 semaines
Defective main water valve1 to 5 days
Defective street light3 weeks
Defective traffic light3 days
Defective water meter1 to 4 weeks
Drop in water pressure1 week
Flood1 to 5 days
Green residue collection not completed24 h to 48 h
Inspection of existing pool2 to 4 weeks
Sewer blocked, unusual smell or sewer back-up1 to 5 days
Special collection not completed2 weeks
Taste or colour of water1 to 5 days
Tree inspection on public right-of-way2 to 4 weeks
Tree stump to be removed in a public space1.5 years
Waste found in a park1 week
Waste on public roadAs soon as possible
Water main break1 to 5 days
Weed to remove in public space3 semaines